03.08.2021 Business

Case Study: Tarmac CRH

Three Bay Modular Refurbishment

Key Facts:

  • CLIENT: Tarmac CRH
  • LOCATION: London
  • SIZE: 108m2
  • SECTOR: Construction
  • TYPE: 3 Bay Single Storey
  • COMPLETION WITHIN: 8 Weeks
  • TOTAL TIME ON SITE: 1 Week
  • DATE: June/July 2021

 

Client Brief
As a leading supplier of construction materials and products, Tarmac required a high-quality office to incorporate meeting rooms with WC’s and kitchen to enhance their facilities at an existing site. It was imperative that the vast majority of fit-out was completed ”off-site” to ensure that once delivered, the client could take possession and occupation.

The Result
From our vast pre-owned modular stock, PF modular selected a 3no 12m x 3m module complex. We were then able to quickly strip out, reconfigure and fit-out to the design and finish that our client required. It took 8 weeks from the design to the delivery of the building.

The Challenges
Due to being situated on a “live working site” the install and fit-out needed to adhere to high safety standards and to ensure minimal disruption.
It was equally important that the aesthetics of the building that was delivered mirrored that of existing buildings at the facility.
We had to ensure that the foundation drawing which was issued to clients Engineers had minimal tolerances to the footprint of the structure.

Images

One of the modules being loaded onto the delivery lorry.

 

The interior before work carried out on decoration and refurb.

Interior view of above nearing completion.

Exterior view of the finished modular building.

 

For any modular construction project, please get in touch today or, alternatively, look at our modular buildings pages or current stock.

 

 

Related Posts

Priestlands School used modular building. 2 storey refurbished modular building with timber cladding

26.04.2024 Posts & News

The environmental benefits of modular construction in education

Schools, colleges and universities need to set a good example for the next generation and provide young people with positive role models. A large...

Continue Reading
A new modular office

26.04.2024 Posts & News

How modular offices can transform your business image

Your office environments play a significant role in shaping how clients, partners and employees perceive your business. Luckily for organisations based all around the...

Continue Reading
Temporary buildings for hire

12.03.2024 Posts & News

Why hiring a temporary building is the perfect solution to your business needs.

Businesses have to be ready to handle anything that arises. Responding to unforeseen circumstances can put a strain on a company, so having facilities...

Continue Reading