17.01.2019• Buildings

Installation Of A Modular Building With Video

Modern living room with a set of sofas and chairs surrounding a glass coffee table, adjacent to a glass-walled dining area. The kitchen is visible in the background.

High-specification build in just 6 weeks – six-week timelapse video

How long does it take to construct a modular building? Watch our time-lapse video documenting the on-site construction of a 180 sqm modular building in Hampshire, England, to see the answer.

The beauty of modular construction is that the majority of the build and fit-out can take place off-site, with the semi-complete building being craned into position towards the end of the process, which minimises disruption, costs and total construction time.

This build, with an approximate budget of £250k, took just 6 weeks to complete. Using pre-owned frames which were redesigned by our structural engineer, with extra steel to strengthen the load-bearing capabilities for the FSC-certified timber truss roof and clay roof tiles, this building also met the customer’s requirement for sustainability and our company ethos of “reduce, recycle, reuse”. A separate porch entrance was added using lightweight faux stone blocks, and the external finish included brick slips to blend with the surrounding buildings.

Here’s the finished building – the camera had to be moved in order to get the road added – which is why you don’t actually see this at the end of the video, unfortunately. Next time, we’ll put the camera in a different place!

mod-building-install

If you need a modular building for your school, expand quickly with a portable office or bring in new customers via a sales and marketing suite get in touch to speak to our expert team. We firmly believe modular construction is the future.

Update for August 2019:

We’ve just been back to the site and thought it would be great to show how fantastic this building looks on the inside too:

Related Posts

16.09.2026• Modular Buildings

Traditional vs. Modular: A Cost-Benefit Analysis for Growing SMEs

For a growing SME, needing more space is usually a good problem to have. More employees, new contracts, additional equipment or an expanding operation...

Continue Reading

09.09.2026• Modular Buildings

The Hybrid Hub: Why Satellite Offices Are Replacing the Central Headquarters

The word “headquarters” signifies the unquestioned centre of business. Employees travel to it, teams are organised around it, and workspace strategy largely involves deciding...

Continue Reading

12.08.2026• Modular Buildings, Posts & News

SEN-Friendly Design: Creating Inclusive Learning Spaces in Modular Classrooms

When discussing SEND provision, the conversation tends to revolve around staffing, funding, interventions and curriculum. The building itself is rarely even on the docket....

Continue Reading