17.01.2019 Buildings

Installation Of A Modular Building With Video

Modern living room with a set of sofas and chairs surrounding a glass coffee table, adjacent to a glass-walled dining area. The kitchen is visible in the background.

High-specification build in just 6 weeks – six-week timelapse video

How long does it take to construct a modular building? Watch our time-lapse video documenting the on-site construction of a 180 sqm modular building in Hampshire, England, to see the answer.

The beauty of modular construction is that the majority of the build and fit-out can take place off-site, with the semi-complete building being craned into position towards the end of the process, which minimises disruption, costs and total construction time.

This build, with an approximate budget of £250k, took just 6 weeks to complete. Using pre-owned frames which were redesigned by our structural engineer, with extra steel to strengthen the load-bearing capabilities for the FSC-certified timber truss roof and clay roof tiles, this building also met the customer’s requirement for sustainability and our company ethos of “reduce, recycle, reuse”. A separate porch entrance was added using lightweight faux stone blocks, and the external finish included brick slips to blend with the surrounding buildings.

Here’s the finished building – the camera had to be moved in order to get the road added – which is why you don’t actually see this at the end of the video, unfortunately. Next time, we’ll put the camera in a different place!

mod-building-install

If you need a modular building for your school, expand quickly with a portable office or bring in new customers via a sales and marketing suite get in touch to speak to our expert team. We firmly believe modular construction is the future.

Update for August 2019:

We’ve just been back to the site and thought it would be great to show how fantastic this building looks on the inside too:

Related Posts

Wooden building labeled "SALES & MARKETING SUITE"; features large windows, sloped black metal roof, parked white van in sunny setting with trees and partially cloudy sky.

15.07.2026 Modular Buildings

The ‘Pop-Up’ Marketing Suite: Creating a High-End Sales Experience on a Construction Site

There’s a strange challenge at the heart of every property development: You need people to buy into the vision long before the vision actually...

Continue Reading

07.07.2026 Posts & News

The Future of UK Construction: What Europe’s Modular Boom Means for Schools, Healthcare and Developers

According to a recent market report, the European modular construction industry was already worth around £25 billion in 2025, and is projected to climb...

Continue Reading
A long, single-story modular building with wooden and dark green panels stands in a parking lot. Metal ramps and stairs provide access. Multi-story buildings and marked parking spaces surround it.

26.06.2026 Buildings, Modular Buildings

Why ‘Used’ Doesn’t Mean Compromise When It Comes to Modular Classrooms

When schools hear the phrase “used classroom”, the general reaction is understandable. Will it look old or run down? Will it feel temporary? Will...

Continue Reading